Final | 4/28/2011 | 4/28/2011 | 4/28/2011 | P | PASS |
Dixie Fellows
|
|
|
please call mat if you have any trouble getting in door should be open or call tom at ###-#### Thank You you can go anytime Phone #: ###-#### >> Inspection requested via web by tom bratcher
|
Final | 4/26/2011 | 4/27/2011 | 4/27/2011 | P | NH |
Bill VanDegrift
|
|
|
Please call me if you have any questions, Tom Phone #: ###-#### >> Inspection requested via web by tom bratcher door locked
|
Rough-in | 3/25/2011 | 3/25/2011 | 3/25/2011 | P | PART |
Dixie Fellows
|
|
|
partial r/i...ok to cover walls...need to add a supply grill in massage room and need another r/a in main room....need to check make-up air and balancing on final
|
Conference | 3/25/2011 | 3/25/2011 | 3/25/2011 | P | PASS |
Dixie Fellows
|
|
|
meet at 1:45...discussed make-up air intake and air balance
|
Rough-in | 3/24/2011 | 3/25/2011 | 3/25/2011 | A | PEND |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by tom bratcher...called for conference
|