Final | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PASS |
Alan Hauser
|
|
|
|
Final | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PASS |
Jim Johnson
|
|
|
oleg Phone #: ###-####
|
Rough-in | 3/30/2011 | 3/30/2011 | 3/30/2011 | P | PART |
Alan Hauser
|
|
|
hvac as per wrightsoft, no duct blaster test yet, look for this at final
|
Pressure Test | 3/30/2011 | 3/30/2011 | 3/30/2011 | P | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 3/29/2011 | 3/30/2011 | 3/30/2011 | A | PASS |
Alan Hauser
|
|
|
20#
|