Final | 5/17/2011 | 5/18/2011 | 5/18/2011 | A | PASS |
Dixie Fellows
|
|
|
Scott will e-mail the balance report to you. >> Inspection requested via web by Stephanie Brown...duct blaster report on electrical panel...air balance report e-mailed to tjames
|
Rough-in | 4/15/2011 | 4/18/2011 | 4/18/2011 | A | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | FAIL |
Dixie Fellows
|
|
|
Dirk will drop those plans off so that they will be on the jobsite tomorrow.
Thanks, >> Inspection requested via web by Stephanie Brown...still no plans on site..no ductwork installed
|
Rough-in | 4/7/2011 | 4/11/2011 | 4/11/2011 | P | FAIL |
Bill VanDegrift
|
|
|
>> Inspection requested via web by Stephanie Brown provide approved plans with ACCA report
|