Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberMEC11-01124
StatusFinaled
Name HIGH MARK PLUMBING INC
Site Address 400 N MILWAUKEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Mechanical Permit - New: Run duct work, set curbs and drops, rough in heating 1st and 2nd floor and trim out
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final8/3/20118/4/20118/4/2011APASS
DetailsAlan Hauser
Final8/3/20118/3/20118/4/2011PPASS
DetailsAlan Hauser
couldn't find card, alan was with kohls people some where
Rough-in7/6/20117/7/20117/7/2011APASS
DetailsAlan Hauser
all grid ceiling areas ok for cover
Rough-in6/17/20116/17/20116/17/2011PPART
DetailsAlan Hauser
Ceiling Inspection on 2nd floor for sales are and areas that have grid in them. Phone #: ###-#### >> Inspection requested via web by Kirk Johns
Rough-in6/10/20116/13/20116/13/2011APART
DetailsAlan Hauser
hard ceiling areas ok for cover
Conference6/3/20116/3/20116/3/2011PPASS
DetailsAlan Hauser
need opion on unit heater venting into loading dock
wrote c/n that manufacture wants heater vented to the outdoors, not into the loading dock bays
Rough-in6/3/20116/3/20116/3/2011APART
DetailsAlan Hauser
all fire dampers installed as per manufacture instructions, ok for cover
Rough-in5/28/20115/31/20115/31/2011AFAIL
DetailsAlan Hauser
fire damper installation guide not on site
Rough-in5/23/20115/24/20115/24/2011AFAIL
DetailsTroy James
ducts ok at second and first floor, need fire damper installation instructions and need the fire dampers installed in floor
Rough-in5/23/20115/23/20115/23/2011PCANC
DetailsTroy James
Partial Rough-in inspection for first floor heating at Kohls. Any questions, please contact Andrew at ###-#### Phone #: ###-#### >> Inspection requested via web by Kirk Johns
rescheduled with andrew
Rough-in4/27/20114/28/20114/28/2011APART
DetailsAlan Hauser
2nd floor duct sealed and insulated, ready for grid
Rough-in4/14/20114/14/20114/14/2011PPART
DetailsAlan Hauser
gas line holding pressure 60# test
just starting duct installation