Final | 7/12/2011 | 7/13/2011 | 7/13/2011 | A | PASS |
Eric Strole
|
|
|
Please call Brian at ###-#### if any corrections needed. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|
Rough-in | 5/31/2011 | 5/31/2011 | 5/31/2011 | P | PASS |
Dixie Fellows
|
|
|
Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek...r/i and 20lb gas ok..i witnessed the duct blaster test...report on furnace
|
Rough-in | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | FAIL |
Troy James
|
|
|
Please call me prior to going out here, thanks, Jeff Creek ###-#### Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek supply ducts wrong size per design
|
Pressure Test | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | CANC |
Troy James
|
|
|
Please call me prior to going out here, thanks, Jeff Creek ###-#### Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek Inspection cancelled from web by: Andrea Creek
|
Rough-in | 5/25/2011 | 5/26/2011 | 5/26/2011 | A | FAIL |
Alan Hauser
|
|
|
need clarification on transfer grill sizes missing run in master bath no duct blaster test
|
Pressure Test | 5/25/2011 | 5/26/2011 | 5/26/2011 | A | PASS |
Alan Hauser
|
|
|
20#
|