Final | 10/25/2011 | 10/26/2011 | 10/26/2011 | A | PASS |
Troy James
|
|
|
final Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen
|
Rough-in | 6/20/2011 | 6/20/2011 | 6/20/2011 | P | PASS |
Troy James
|
|
|
Re-inspect of chase Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen
|
Final | 6/20/2011 | 6/20/2011 | 6/20/2011 | P | PASS |
Troy James
|
|
|
Re-inspect of chase Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen contractor wrapped grease duct to outside per approved plans
|
Rough-in | 6/17/2011 | 6/17/2011 | 6/17/2011 | P | FAIL |
Troy James
|
|
|
grease duct is not installed per approved resubmitted plans, must install per approved plans or resubmitt for approval. Informed contractor 6-16-11. Told him to contact designer for approved drawings.
|
Rough-in | 6/16/2011 | 6/16/2011 | 6/16/2011 | P | PASS |
Troy James
|
|
|
light test grease duct and re-inspect ductwork Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen ok grease duct elbow and transition, need to inspect welds on roof, ok to cover ceiling
|
Rough-in | 6/15/2011 | 6/15/2011 | 6/15/2011 | P | FAIL |
Troy James
|
|
|
Cover inspection Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen line set and condensate not completed and need plumber to complete gas and condensate to make-up unit
|
Rough-in | 6/13/2011 | 6/13/2011 | 6/13/2011 | P | PART |
Dixie Fellows
|
|
|
Light test at shop - duct inspection on site Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen..light test on vertical grease duct ok
|
Rough-in | 6/9/2011 | 6/10/2011 | 6/10/2011 | A | NR |
Dixie Fellows
|
|
|
Carri Phone #: ###-####...kerry will reschedule for monday am for light test on duct at their shop
|
Rough-in | 6/8/2011 | 6/8/2011 | 6/8/2011 | A | FAIL |
Dixie Fellows
|
|
|
check grease duct with light test...pinholes located..they will fix and recall
|
Conference | 6/7/2011 | 6/8/2011 | 6/8/2011 | A | PASS |
Dixie Fellows
|
|
|
Structural Conference - Cary Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen...met with dave h. and kerry to discuss relocation of grease duct and shaft to roof
|
Conference | 6/7/2011 | 6/7/2011 | 6/7/2011 | P | PART |
Dixie Fellows
|
|
|
conference - Cary Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen...will call dave h. to meet to discuss shaft for grease duct
|
Rough-in | 6/2/2011 | 6/3/2011 | 6/3/2011 | A | PASS |
Dixie Fellows
|
|
|
hard lid - partial rough-in Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen...ok to cover hard lid
|
Conference | 9/29/2011 | 9/29/2011 | | A | |
Dixie Fellows
|
|
|
|