Final | 10/25/2011 | 10/26/2011 | 10/26/2011 | A | PASS |
Alan Hauser
|
|
|
|
Final | 10/24/2011 | 10/25/2011 | 10/25/2011 | A | FAIL |
Alan Hauser
|
|
|
no combustion air to equipment in closet
|
Mec-Aging Inspection | 10/12/2011 | 10/12/2011 | 10/12/2011 | | CANC |
Alan Hauser
|
|
|
|
Rough-in | 7/11/2011 | 7/12/2011 | 7/12/2011 | A | PASS |
Alan Hauser
|
|
|
20# gas test duct blaster ok as per wrightsoft
|
Rough-in | 7/11/2011 | 7/11/2011 | 7/11/2011 | P | FAIL |
Alan Hauser
|
|
|
wrong wrightsoft attached to these plans this is the wrightsoft for the side still being framed
|
Rough-in | 7/5/2011 | 7/7/2011 | 7/7/2011 | A | NR |
Alan Hauser
|
|
|
witnessed duct blaster test no equipment, ra loss 14 sa loss 18 no approved plans on site
|