Final | 7/27/2011 | 7/27/2011 | 7/27/2011 | P | PASS |
Dixie Fellows
|
|
|
Please give Brian ###-#### a call if any corrections. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|
Rough-in | 6/15/2011 | 6/15/2011 | 6/15/2011 | P | PASS |
Eric Strole
|
|
|
Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|
Rough-in | 6/14/2011 | 6/14/2011 | 6/14/2011 | P | FAIL |
Eric Strole
|
|
|
need to resubmit manual j specs with all windows and equipment
|
Rough-in | 6/13/2011 | 6/14/2011 | 6/14/2011 | A | FAIL |
Eric Strole
|
|
|
Please call Matt with momentum to coordinate the duct blaster test at ###-####. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-need to resumit manual j specs,equipment not per approved specs, duct blast test pass.
|
Conference | 6/13/2011 | 6/14/2011 | 6/14/2011 | A | DONE |
Eric Strole
|
|
|
duct blaster test @ 10:00am-duct blaster test pass
|
Pressure Test | 6/13/2011 | 6/14/2011 | 6/14/2011 | A | PASS |
Eric Strole
|
|
|
Please call Matt with momentum to coordinate the duct blaster test at ###-####. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|