Final | 8/17/2011 | 8/18/2011 | 8/18/2011 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Final | 8/17/2011 | 8/17/2011 | 8/17/2011 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino-design cfm's on manual j report do not match design cfm's on air balance report.
|
Final | 8/12/2011 | 8/12/2011 | 8/12/2011 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino-no air balance or manual j report on site.
|
Pressure Test | 6/22/2011 | 6/22/2011 | 6/22/2011 | P | PASS |
Troy James
|
|
|
Building Energy will perform duct blast test @ 3pm on 6/22/11. Phone #: ###-#### >> Inspection requested via web by Debbie Marino 25# test
|
Rough-in | 6/22/2011 | 6/22/2011 | 6/22/2011 | P | PASS |
Troy James
|
|
|
Building Energy will perform duct blast test @ 3pm on 6/22/11. Phone #: ###-#### >> Inspection requested via web by Debbie Marino duct blaster test completed
|