Final | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | PASS |
Dixie Fellows
|
|
|
Brian will be on site, if there is any questions. Thank you. Phone #: ###-#### >> Inspection requested via web by Jeff Miranda
|
Pressure Test | 6/28/2011 | 6/28/2011 | 6/28/2011 | P | PASS |
Alan Hauser
|
|
|
2-100# test on hydronics
|
Pressure Test | 6/28/2011 | 6/28/2011 | 6/28/2011 | A | PEND |
Dixie Fellows
|
|
|
Brian is the contact for this job. Thank you Phone #: ###-#### >> Inspection requested via web by Jeff Miranda...contractor rescheduled for pm
|
Pressure Test | 6/23/2011 | 6/23/2011 | 6/23/2011 | A | PART |
Dixie Fellows
|
|
|
The inspection is for the main lines feeding remote manifolds. Brian will be on the job, any questions please call him at ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Jeff Miranda...test not ready...ok to cover supply and return
|