Final | 8/10/2011 | 8/11/2011 | 8/11/2011 | A | PASS |
Eric Strole
|
|
|
If any corrections please call Brian ###-####. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|
Pressure Test | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Eric Strole
|
|
|
Matt is scheduled for 10am ductblaster test, please call Brian ###-#### if any corrections needed. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-20 lb test pass
|
Rough-in | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Eric Strole
|
|
|
Matt is scheduled for 10am ductblaster test, please call Brian ###-#### if any corrections needed. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-duct blast & rough-in pass
|