Final | 9/27/2011 | 9/27/2011 | 9/27/2011 | P | PASS |
Eric Strole
|
|
|
oleg Phone #: ###-####
|
Rough-in | 7/21/2011 | 7/21/2011 | 7/21/2011 | A | PASS |
Dixie Fellows
|
|
|
duct blaster meet aj at 10:30...duct blaster test ok...document on furnace
|
Rough-in | 7/20/2011 | 7/21/2011 | 7/21/2011 | A | PART |
Dixie Fellows
|
|
|
Oleg Phone #: ###-####...r/i and 20lb gas ok...meeting aj to do the duct blaster at 10:30
|
Rough-in | 7/15/2011 | 7/18/2011 | 7/18/2011 | A | FAIL |
Alan Hauser
|
|
|
need 1" clearance at b-vent 2nd floor chase sill plate
|
Rough-in | 7/14/2011 | 7/14/2011 | 7/14/2011 | P | FAIL |
Eric Strole
|
|
|
hook up return to furnace, furnace flue not glued 1st & 2nd flr, complete framing at b-vent 2nd flr & seal range exhaust in crawl & need duct blast test.
|
Conference | 7/14/2011 | 7/14/2011 | 7/14/2011 | P | CANC |
Eric Strole
|
|
|
duct blaster test
|
Pressure Test | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | PASS |
Bill VanDegrift
|
|
|
r/i and pt//Oleg Phone #: ###-#### 20# test ok fire place ok
|