Final | 9/5/2011 | 9/6/2011 | 9/6/2011 | A | PASS |
Eric Strole
|
|
|
Thanks, Brian ####-#### Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|
Rough-in | 7/27/2011 | 7/28/2011 | 7/28/2011 | P | PASS |
Eric Strole
|
|
|
Scheduled ductblaster test with matt ###-#### for 1pm. If you need to change please call Matt. If any corrections please call Brian ###-####. Thanks, Andrea Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-blast test & r/i pass
|
Pressure Test | 7/27/2011 | 7/28/2011 | 7/28/2011 | P | PASS |
Eric Strole
|
|
|
Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-20 lb test pass
|