Final | 9/23/2011 | 9/23/2011 | 9/23/2011 | A | PASS |
Bill VanDegrift
|
|
|
|
Final | 9/22/2011 | 9/23/2011 | 9/23/2011 | A | NR |
Bill VanDegrift
|
|
|
Please complete final inspection. Contact Eric with any questions Phone #: ###-#### >> Inspection requested via web by Jillian Andrews no air balance report on job left message with Eric.
|
Final | 9/19/2011 | 9/20/2011 | 9/20/2011 | A | CANC |
Eric Strole
|
|
|
please complete a final inspection. Call Jason with any issues ###-#### Phone #: ###-#### >> Inspection requested via web by Alana Lane Inspection cancelled from web by: Jillian Andrews
|
Rough-in | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | PASS |
Eric Strole
|
|
|
Please call Eric with any questions Phone #: ###-#### >> Inspection requested via web by Alana Lanerough-in and blast test pass.
|
Rough-in | 8/9/2011 | 8/10/2011 | 8/9/2011 | P | CANC |
Troy James
|
|
|
Matt with Momentum will be there 1pm for duct blast. Please schedule then. Questions please call Eric ###-#### Phone #: ###-#### >> Inspection requested via web by Alana Lane Inspection cancelled from web by: Alana Lane
|
Rough-in | 8/9/2011 | 8/10/2011 | 8/9/2011 | A | CANC |
Eric Strole
|
|
|
Inspection cancelled from web by: Alana Lane
|
Rough-in | 8/8/2011 | 8/9/2011 | 8/9/2011 | A | FAIL |
Eric Strole
|
|
|
Please complete rough in/pressure test. Call Eric with results and/or questions. Phone #: ###-#### >> Inspection requested via web by Alana Lane-need approved manual j report on site for rough-in.
|
Pressure Test | 8/3/2011 | 8/4/2011 | 8/4/2011 | A | PASS |
Eric Strole
|
|
|
Pressure Test only. Not ready for Mechanical. Please call eric with any questions ###-####. Phone #: ###-#### >> Inspection requested via web by Alana Lane-20 lb test pass
|