Final | 11/18/2011 | 11/18/2011 | 11/18/2011 | P | PASS |
Troy James
|
|
|
Ok per balance report on plans. Using engineers numbers from previous design using existing air handler for make up air.
|
Pressure Test | 11/16/2011 | 11/18/2011 | 11/17/2011 | P | CANC |
Troy James
|
|
|
meet at 3:30pm contractor pulled another permit for gas piping work
|
Rough-in | 10/13/2011 | 10/14/2011 | 10/14/2011 | A | PASS |
Troy James
|
|
|
need air balance report for final
|
Rough-in | 10/10/2011 | 10/10/2011 | 10/11/2011 | P | PASS |
Troy James
|
|
|
ok grease duct
|
Pressure Test | 9/29/2011 | 9/30/2011 | 9/30/2011 | A | PASS |
Troy James
|
|
|
gas piping on roof
|
Conference | 9/12/2011 | 9/12/2011 | 9/12/2011 | P | PASS |
Troy James
|
|
|
test
|
Rough-in | 9/9/2011 | 9/9/2011 | 9/9/2011 | A | PASS |
Troy James
|
|
|
ok gas line test to grill and pizza oven and radiant fire dampers
|
Rough-in | 8/24/2011 | 8/25/2011 | 8/25/2011 | A | PASS |
Troy James
|
|
|
ok grease duct wrap
|
Rough-in | 8/19/2011 | 8/19/2011 | 8/19/2011 | P | PASS |
Troy James
|
|
|
ok to wrap grease ducts
|
Rough-in | 8/15/2011 | 8/15/2011 | 8/15/2011 | P | PASS |
Troy James
|
|
|
ok light test to grease duct on ground and duct above soffits in dining area
|
Conference | 8/9/2011 | 8/9/2011 | 8/9/2011 | P | DONE |
Troy James
|
|
|
met with dave hannah, steve ymc, and HC general contractor to discuss grease duct wrap termination to existing shaft.
|