Pressure Test | 8/17/2011 | 8/19/2011 | 8/19/2011 | P | PASS |
Eric Strole
|
|
|
>> Inspection requested via web by Dustin Rich-20 lb test pass
|
Final | 8/17/2011 | 8/19/2011 | 8/19/2011 | P | PASS |
Eric Strole
|
|
|
>> Inspection requested via web by Dustin Rich
|
Final | 8/15/2011 | 8/16/2011 | 8/16/2011 | A | FAIL |
Eric Strole
|
|
|
Need to add gas piping to permit and test.
|
Conference | 8/15/2011 | 8/16/2011 | 8/15/2011 | A | CANC |
Eric Strole
|
|
|
|
Final | 8/9/2011 | 8/15/2011 | 8/15/2011 | P | NR |
Eric Strole
|
|
|
installer ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|