Final | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | PASS |
Troy James
|
|
|
final inspection call john lodman @ ###-#### before going out Phone #: ###-#### >> Inspection requested via web by Robin Cox
|
Conference | 8/22/2011 | 8/23/2011 | 8/23/2011 | A | PASS |
Dixie Fellows
|
|
|
dave h will call to meet him at job....dave went to the job and gave them the approval on the framing
|
Conference | 8/22/2011 | 8/22/2011 | 8/22/2011 | P | PEND |
Dixie Fellows
|
|
|
consultation to coordiante with the structural contact John Lodman ###-#### Phone #: ###-#### >> Inspection requested via web by Robin Cox...no calls as of 5:00 so i called dave h. ---he will call me in the am to meet him at job
|
Conference | 8/11/2011 | 8/12/2011 | 8/12/2011 | A | PASS |
Dixie Fellows
|
|
|
consultation with dixies per John Lodman any questions call john ###-#### Phone #: ###-#### >> Inspection requested via web by Robin Cox...discussed the need for manuf specs and call for inspection at framimg
|
Conference | 8/11/2011 | 8/12/2011 | 8/11/2011 | A | CANC |
Dixie Fellows
|
|
|
consultation needed with inpector Phone #: ###-#### >> Inspection requested via web by Robin Cox Inspection cancelled from web by: Robin Cox
|