Final | 10/25/2011 | 10/25/2011 | 10/25/2011 | A | PASS |
Dixie Fellows
|
|
|
air balance ok...final ok
|
Conference | 10/24/2011 | 10/24/2011 | 10/25/2011 | P | PASS |
Bill VanDegrift
|
|
|
clearances above range approved and air balance report will be attached to the building permit.
|
Final | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | FAIL |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...no air balance report on site...still need clearances above the range..$reinspection fee
|
Final | 10/19/2011 | 10/20/2011 | 10/20/2011 | A | FAIL |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...need approved manual J on site..need clearance above range per manuf
|
Rough-in | 8/22/2011 | 8/22/2011 | 8/22/2011 | P | PASS |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...r/i and 20lb gas ok...duct blaster ok...includes 2 f/p
|
Rough-in | 8/19/2011 | 8/22/2011 | 8/22/2011 | A | FAIL |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...c/n not done
|
Rough-in | 8/18/2011 | 8/18/2011 | 8/18/2011 | P | FAIL |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...need full set of manual j documents..need 1/4" slope on f/p--need clearance above stand-off at top of f/p in great rooom as well as manuf specs and the gas line isn't complete--bath exhaust under the stairs is smashed into inner liner..seal filter box above furnace...no gas test done.
|