Final | 10/10/2011 | 10/10/2011 | 10/10/2011 | P | PASS |
Troy James
|
|
|
|
Final | 9/22/2011 | 9/23/2011 | 9/23/2011 | A | PASS |
Bill VanDegrift
|
|
|
>> Inspection requested via web by Stephanie Brown
|
Conference | 8/30/2011 | 8/30/2011 | 8/30/2011 | P | DONE |
Eric Strole
|
|
|
Need to check equipment on final !!!!!!
|
Rough-in | 8/29/2011 | 8/29/2011 | 8/29/2011 | A | PASS |
Troy James
|
|
|
duct blast ok, will resubmitt new manual j for correct equipment selection
|
Rough-in | 8/24/2011 | 8/25/2011 | 8/25/2011 | A | FAIL |
Eric Strole
|
|
|
10 am blasting witness >> Inspection requested via web by Stephanie Brown-equipment and supply runs do not match manual j report.
|
Rough-in | 8/24/2011 | 8/24/2011 | 8/24/2011 | P | CANC |
Bill VanDegrift
|
|
|
>> Inspection requested via web by Stephanie Brown till am
|