Final | 6/22/2012 | 6/25/2012 | 6/26/2012 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 5/2/2012 | 5/2/2012 | 5/2/2012 | P | PART |
Alan Hauser
|
|
|
all gas piping has been tested at 100#
|
Pressure Test | 4/24/2012 | 4/25/2012 | 4/25/2012 | A | CANC |
Alan Hauser
|
|
|
|
Pressure Test | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | PART |
Alan Hauser
|
|
|
test ok on piping at main entrance area
|
Pressure Test | 2/13/2012 | 2/14/2012 | 2/14/2012 | A | PART |
Alan Hauser
|
|
|
60# test on buried pipe from meter to boiler/chiller room
|
Pressure Test | 1/9/2012 | 1/10/2012 | 1/10/2012 | A | PART |
Alan Hauser
|
|
|
test ok on piping sticking out south side of building
|
Pressure Test | 11/21/2011 | 11/22/2011 | 11/22/2011 | A | PART |
Alan Hauser
|
|
|
|
Pressure Test | 11/14/2011 | 11/15/2011 | 11/15/2011 | P | PART |
Bill VanDegrift
|
|
|
if questions call Mark @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann snow melt stub outs leaking at flanges will retest when installed.
|
Pressure Test | 11/1/2011 | 11/2/2011 | 11/2/2011 | A | PART |
Alan Hauser
|
|
|
all snow melt piping in building tested at 100#
|
Pressure Test | 10/26/2011 | 10/27/2011 | 10/27/2011 | A | PART |
Alan Hauser
|
|
|
if questions call Mark @ ###-#### hydronic test 100# ok for loop around east end
|