Final | 10/7/2011 | 10/7/2011 | 10/7/2011 | P | PASS |
Eric Strole
|
|
|
Manual J and test results are taped to the furnace with an additional copy located on the kitchen counter. >> Inspection requested via web by Stephanie Brown
|
Final | 10/7/2011 | 10/7/2011 | 10/7/2011 | P | CANC |
Eric Strole
|
|
|
>> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|
Final | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | FAIL |
Eric Strole
|
|
|
>> Inspection requested via web by Stephanie Brown-need air balance and manual j report on site for final.
|
Rough-in | 9/7/2011 | 9/8/2011 | 9/8/2011 | A | PASS |
Eric Strole
|
|
|
>> Inspection requested via web by Stephanie Brown-duct blast test, 20 lb gas test & rough-in pass. on final need to check missing register out side hall bath 1st flr & straping in crawl where was removed by other trade.
|
Rough-in | 9/6/2011 | 9/8/2011 | 9/6/2011 | P | CANC |
Troy James
|
|
|
3:30 duct blasting witness. Scott ###-#### >> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|
Rough-in | 9/6/2011 | 9/7/2011 | 9/6/2011 | P | CANC |
Troy James
|
|
|
3:30 duct blasting witness. Scott ###-#### >> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|