Final | 10/28/2011 | 10/31/2011 | 10/31/2011 | A | PASS |
Alan Hauser
|
|
|
|
Final | 10/25/2011 | 10/25/2011 | 10/25/2011 | P | NR |
Alan Hauser
|
|
|
finish wiring at furnace couldn't find air balance report 3162
|
Rough-in | 9/16/2011 | 9/16/2011 | 9/16/2011 | P | PART |
Bill VanDegrift
|
|
|
needs to change furnace to a 45k from the 70k installed
|
Rough-in | 9/16/2011 | 9/16/2011 | 9/16/2011 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino wrong furnace installed approved plans call for a 45k and a 70k is installed
|
Rough-in | 9/15/2011 | 9/15/2011 | 9/15/2011 | P | FAIL |
Bill VanDegrift
|
|
|
Matt w/Momentum will perform the duct blast test at 2pm on 9/15/11 Phone #: ###-#### >> Inspection requested via web by Debbie Marino
range hood exhaust must be air tight, provide ACCA report. 20# test ok
|
Pressure Test | 9/15/2011 | 9/15/2011 | 9/15/2011 | P | PASS |
Bill VanDegrift
|
|
|
Matt w/Momentum will perform the duct blast test at 2pm on 9/15/11 Phone #: ###-#### >> Inspection requested via web by Debbie Marino 20 test ok
|