Final | 11/17/2011 | 11/17/2011 | 11/17/2011 | P | PASS |
Eric Strole
|
|
|
|
Conference | 11/16/2011 | 11/17/2011 | 11/17/2011 | A | DONE |
Eric Strole
|
|
|
8:00 am-this was a conferance over air balance reports.
|
Conference | 11/16/2011 | 11/17/2011 | 11/16/2011 | A | CANC |
Eric Strole
|
|
|
|
Final | 11/15/2011 | 11/16/2011 | 11/16/2011 | A | FAIL |
Eric Strole
|
|
|
after 10:00 am-air balance report is not correct.
|
Final | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | FAIL |
Eric Strole
|
|
|
>> Inspection requested via web by Dustin Rich-no manual j on site.
|
Rough-in | 10/5/2011 | 10/5/2011 | 10/5/2011 | A | PASS |
Eric Strole
|
|
|
rough-in pass. no duct blast test at this time.
|
Pressure Test | 10/4/2011 | 10/5/2011 | 10/5/2011 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich-20 lb gas test pass.
|
Pressure Test | 10/3/2011 | 10/4/2011 | 10/4/2011 | A | FAIL |
Eric Strole
|
|
|
>> Inspection requested via web by Dustin Rich-gas test fail
|
Rough-in | 10/3/2011 | 10/4/2011 | 10/4/2011 | A | PART |
Eric Strole
|
|
|
>> Inspection requested via web by Dustin Rich-rough-in pass, no duct blast test at this time.
|
Rough-in | 9/30/2011 | 10/3/2011 | 10/3/2011 | A | FAIL |
Eric Strole
|
|
|
>> Inspection requested via web by Dustin Rich-need approved manual j report on site for rough-in.
|
Pressure Test | 9/30/2011 | 10/3/2011 | 10/3/2011 | A | FAIL |
Eric Strole
|
|
|
>> Inspection requested via web by Dustin Rich-20 lb test fail
|