Final | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Final | 11/22/2011 | 11/23/2011 | 11/23/2011 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino-no air balance or manual-j report on site.
|
Pressure Test | 10/3/2011 | 10/3/2011 | 10/3/2011 | P | PASS |
Eric Strole
|
|
|
Building Energy will perform the duct blast test on 10/3/11 at 1pm Phone #: ###-#### >> Inspection requested via web by Debbie Marino-20 lb test pass
|
Rough-in | 10/3/2011 | 10/3/2011 | 10/3/2011 | P | PASS |
Eric Strole
|
|
|
Building Energy will perform the duct blast test on 10/3/11 at 1pm Phone #: ###-#### >> Inspection requested via web by Debbie Marino-duct blast test and rough-in pass.
|