Final | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | PASS |
Dixie Fellows
|
|
|
Ready for final after 1 P:M. House is open. Phone #: ###-#### >> Inspection requested via web by Russ Curtis...final ok..air balance ok
|
Rough-in | 9/29/2011 | 9/30/2011 | 9/30/2011 | A | PASS |
Bill VanDegrift
|
|
|
all ok except c/n on f/p ri db 20# test ok
|
Rough-in | 9/29/2011 | 9/29/2011 | 9/29/2011 | P | PEND |
Dixie Fellows
|
|
|
###-####...rescheduled for fri am
|
Rough-in | 9/28/2011 | 9/29/2011 | 9/29/2011 | A | PART |
Dixie Fellows
|
|
|
Talked to Dixie about meeting Matt for duct pressure test at 11 A:M. Please inspect gas pressure test, fireplace install & mech. rough. Phone #: ###-#### >> Inspection requested via web by Russ Curtis...20lb gas ok..duct blaster ok...need clearance above f/p per manufacturer
|
Mec-Aging Inspection | 9/29/2011 | 9/29/2011 | 9/29/2011 | P | CANC |
Dixie Fellows
|
|
|
###-####...oops wrong inspection
|