Final | 4/4/2012 | 4/4/2012 | 4/4/2012 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike Almanza
|
Rough-in | 12/12/2011 | 12/12/2011 | 12/12/2011 | P | PASS |
Bill VanDegrift
|
|
|
request re-inspection. hardi board is moved up for header clearance visibility. >> Inspection requested via web by Mike Almanza fire place rough in only ok with gas line extended through the equipment jacket.
|
Rough-in | 11/22/2011 | 11/22/2011 | 11/22/2011 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike Almanza...extend gas into f/p jacket (connector is going through it now)...unable to see stand-offs at top of f/p due to dura rock..what are they going to do with the flue up through the 2nd floor?
|