Final | 10/25/2012 | 10/25/2012 | 10/25/2012 | P | PASS |
Alan Hauser
|
|
|
|
Mec-Aging Inspection | 8/31/2012 | 8/31/2012 | 9/4/2012 | | CANC |
Alan Hauser
|
|
|
|
Final | 6/1/2012 | 6/1/2012 | 6/1/2012 | P | PART |
Alan Hauser
|
|
|
Need a final inspection on all 4 floors of the core building. Please call Ron @ ###-#### with any questions. Phone #: ###-#### >> Inspection requested via web by Angie maguire
|
Rough-in | 5/30/2012 | 5/30/2012 | 5/30/2012 | A | PART |
Alan Hauser
|
|
|
need the mechanical chase ductwork inspected. If you have any questions, please call Ron @ ###-####. Phone #: ###-#### >> Inspection requested via web by Angie maguire
|
Final | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | PART |
Alan Hauser
|
|
|
Call Ron @ ###-#### with any installation issues/questions. Need a partial final for the 1st & 2nd floors. They want to have partial occupancy. this area ok, missing a few minor grills and things
|
Rough-in | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Alan Hauser
|
|
|
need rough-in for the mail room.ok for cover
|
Rough-in | 4/26/2012 | 4/26/2012 | 4/26/2012 | A | PART |
Alan Hauser
|
|
|
need a rough-in/cover inspection for the lobby area and movie room. ok for cover
|
Rough-in | 4/10/2012 | 4/10/2012 | 4/10/2012 | P | PART |
Alan Hauser
|
|
|
|
Rough-in | 3/14/2012 | 3/14/2012 | 3/14/2012 | P | PART |
Alan Hauser
|
|
|
ok to cover areas signed in job trailer
|
Rough-in | 3/13/2012 | 3/14/2012 | 3/14/2012 | A | PART |
Alan Hauser
|
|
|
ok to cover areas signed in job trailer, all floors
|
Rough-in | 2/13/2012 | 2/14/2012 | 2/14/2012 | A | PART |
Alan Hauser
|
|
|
rooms ok in area A and half of area B all floors
|