Final | 2/2/2012 | 2/3/2012 | 2/3/2012 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Pressure Test | 12/12/2011 | 12/12/2011 | 12/12/2011 | P | PASS |
Eric Strole
|
|
|
Building Energy will perform the duct blast test at 1pm on 12/12/11 Phone #: ###-#### >> Inspection requested via web by Debbie Marino-20 lb test pass.
|
Rough-in | 12/12/2011 | 12/12/2011 | 12/12/2011 | P | PASS |
Eric Strole
|
|
|
Building Energy will perform the duct blast test at 1pm on 12/12/11 Phone #: ###-#### >> Inspection requested via web by Debbie Marino-rough-in and duct blast test pass.
|