Final | 6/21/2012 | 6/22/2012 | 6/22/2012 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...no card on site...super told me i didn't need to sign it
|
Rough-in | 5/9/2012 | 5/10/2012 | 5/10/2012 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH....1st kitchen area and soffits in common area
|
Rough-in | 5/1/2012 | 5/1/2012 | 5/1/2012 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...ok to cover 3rd floor laundry..common area..utility closet
|
Rough-in | 4/16/2012 | 4/17/2012 | 4/17/2012 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...ok for cover in copy room, community room, laundry, locker room and m/w restrooms
|
Rough-in | 4/9/2012 | 4/10/2012 | 4/10/2012 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...all bath fans 2nd floor ok...2nd floor common area ok...eru 3 ductwork ok....1st floor locker and laundry rooms ok for cover
|
Rough-in | 4/2/2012 | 4/2/2012 | 4/2/2012 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH exhaust 3 rd floor west wing looks like south wing to me, ok to cover
|
Rough-in | 3/27/2012 | 3/28/2012 | 3/28/2012 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...s/f damper n. corridor ok...bath exhaust 2nd floor w. ok....2nd floor ERU chase ok
|
Rough-in | 3/22/2012 | 3/23/2012 | 3/23/2012 | A | PART |
Dixie Fellows
|
|
|
8:30 meet jim ###-####...3rd floor n bath /range exhaust ok...1st,2nd,3rd floor dryer vents ok....3rd floor e. bath fans ok..2nd floor w. hallway FC units ok
|
Rough-in | 3/22/2012 | 3/22/2012 | 3/22/2012 | P | NH |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...i rescheduled for fri am...i got there to late
|
Rough-in | 3/8/2012 | 3/9/2012 | 3/9/2012 | A | PART |
Dixie Fellows
|
|
|
###-#### meet at 9:00....1st and 2nd floor bath fans east wing ok.......3rd floor east and west wing erv's ok for cover
|
Rough-in | 3/8/2012 | 3/8/2012 | 3/8/2012 | P | PEND |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH....rescheduled for fri am...unable to get there before he left
|
Rough-in | 3/5/2012 | 3/5/2012 | 3/5/2012 | A | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH 2nd floor range in the south wing ok and 3rd floor range and bath fans in the east wing ok
|
Rough-in | 2/24/2012 | 2/27/2012 | 2/27/2012 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...2nd floor west EVA"S are all ok for cover........2nd floor dryer vents ok for cover
|
Rough-in | 2/17/2012 | 2/17/2012 | 2/17/2012 | P | PART |
Alan Hauser
|
|
|
ok to cover range vents on 2nd floor east wing only
|
Rough-in | 2/13/2012 | 2/14/2012 | 2/14/2012 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...2nd and 3rd floor eru's ok for cover east and west wing...fire dampers at ceiling from 1st to 2nd floor ok in make-up air ducts...ok to cover chase's on 2nd floor east wing
|
Rough-in | 1/18/2012 | 1/19/2012 | 1/19/2012 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...ok to frame ERV 1st floor east...ok to cover shafts on 2nd floor east wing
|
Rough-in | 1/4/2012 | 1/5/2012 | 1/5/2012 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH....ok for cover of all shafts on 1st floor
|