Final | 3/20/2012 | 3/20/2012 | 3/20/2012 | A | PASS |
Jim Johnson
|
|
|
No combustion air because builder is not installing drywall on ceiling. Please call if there are questions. Phone #: ###-#### >> Inspection requested via web by Konrad Swartz no sign off card on site. note- no drywall on ceiling left open for combustion air to mechanical room
|
Rough-in | 2/15/2012 | 2/15/2012 | 2/15/2012 | A | PART |
Alan Hauser
|
|
|
PRESSURE TEST OK 60# still need combustion air into equipment room correction notice at equipment room
|
Pressure Test | 2/14/2012 | 2/14/2012 | 2/14/2012 | P | FAIL |
Alan Hauser
|
|
|
pressure test didn't hold for the thirty minutes required and need combustion air into equipment room
|
Conference | 2/13/2012 | 2/13/2012 | 2/13/2012 | P | CANC |
Alan Hauser
|
|
|
Phone #: ###-#### >> Inspection requested via web by Konrad Swartz Inspection cancelled from web by: Konrad Swartz
|
Pressure Test | 2/10/2012 | 2/10/2012 | 2/10/2012 | P | FAIL |
Alan Hauser
|
|
|
have lost 10#s at guage
|
Pressure Test | 2/9/2012 | 2/9/2012 | 2/9/2012 | A | FAIL |
Alan Hauser
|
|
|
guage on zero
|
Rough-in | 1/19/2012 | 1/19/2012 | 1/19/2012 | P | PART |
Alan Hauser
|
|
|
hard ceiling areas ok for cover STILL NEED PRESSURE TEST
|
Rough-in | 1/17/2012 | 1/18/2012 | 1/18/2012 | P | NR |
Alan Hauser
|
|
|
change transfer ducting to as shown on plan dryer exhaust to be in full 4" wall
|