Final | 4/17/2012 | 4/18/2012 | 4/18/2012 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 12/29/2011 | 12/30/2011 | 12/30/2011 | A | FAIL |
Troy James
|
|
|
rough in for friday 12-30-11 in the AM Phone #: ###-#### >> Inspection requested via web by Robin Cox need platform from attic access and light with switch at access to unit master bedroom
|
Rough-in | 12/27/2011 | 12/29/2011 | 12/29/2011 | A | FAIL |
Troy James
|
|
|
Matt Vandermeer will be on site at 9:00 a.m. to test the duct Phone #: ###-#### >> Inspection requested via web by Robin Cox need additional support to flex at exhaust fans and condensate drains are not completed. Exhaust fans unable to terminate roof at this time. OK no duct blast test for this job.
|