Final | 1/9/2012 | 1/10/2012 | 1/10/2012 | A | PASS |
Eric Strole
|
|
|
Call Eric @ ###-#### with any installation issues/questions. Primer correction completed Phone #: ###-#### >> Inspection requested via web by Angie maguire
|
Final | 1/6/2012 | 1/9/2012 | 1/9/2012 | A | FAIL |
Eric Strole
|
|
|
Call Eric @ ###-#### with any installation issues/questions. Phone #: ###-#### >> Inspection requested via web by Angie maguire-need to use primer and glue fittings for exhaust and fresh air.(NEED TO CHECK GAS METER FOR TAG FROM GAS COMPANY)
|
Pressure Test | 12/14/2011 | 12/14/2011 | 12/14/2011 | P | FAIL |
Troy James
|
|
|
Call Eric @ ###-#### with any installation issues/questions. Phone #: ###-#### >> Inspection requested via web by Angie maguire not ready
|