Final | 1/23/2012 | 1/25/2012 | 1/25/2012 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 1/4/2012 | 1/5/2012 | 1/5/2012 | A | PASS |
Alan Hauser
|
|
|
20# as manual J two duct blaster test ok
|
Rough-in | 1/3/2012 | 1/4/2012 | 1/4/2012 | P | CANC |
Alan Hauser
|
|
|
1 PM duct blasting. Please confirm with Scott ###-#### >> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|
Rough-in | 12/27/2011 | 1/2/2012 | 1/3/2012 | P | CANC |
Alan Hauser
|
|
|
3:00 gas pressure witness. Please confirm with Scott ###-#### >> Inspection requested via web by Stephanie Brown Inspection cancelled from web by: Stephanie Brown
|