Final | 4/26/2012 | 4/26/2012 | 4/26/2012 | P | PASS |
Alan Hauser
|
|
|
|
Final | 4/23/2012 | 4/24/2012 | 4/24/2012 | A | FAIL |
Alan Hauser
|
|
|
correction notice at furnace
|
Rough-in | 1/19/2012 | 1/20/2012 | 1/20/2012 | P | PART |
Alan Hauser
|
|
|
no duct blaster test 20# test for gas as per manual J
|
Rough-in | 1/13/2012 | 1/17/2012 | 1/17/2012 | A | PART |
Alan Hauser
|
|
|
as per manual J correction, can not use flexable air connector material in concealed space. this was used in one area in basement ceiling, replace with class 0 or class 1 material NO DUCT BLASTER TEST AT THIS TIME
|
Rough-in | 1/10/2012 | 1/11/2012 | 1/11/2012 | A | PART |
Jim Johnson
|
|
|
Need rough-in ,Gas presure test Phone #: ###-#### >> Inspection requested via web by johnny frank need approved plans and manual j report for rough-in note -60# gas pressure test test ok
|