Final | 6/20/2012 | 6/21/2012 | 6/21/2012 | A | PASS |
Dixie Fellows
|
|
|
\
|
Final | 6/19/2012 | 6/20/2012 | 6/20/2012 | A | FAIL |
Dixie Fellows
|
|
|
Marco Phone #: ###-####...air balance doesn't match design...equipment to be 6" in from edge of hood...need listed gas flex connectors...how is hood interlocked with equipment?
|
Final | 6/18/2012 | 6/19/2012 | 6/19/2012 | A | FAIL |
Dixie Fellows
|
|
|
Marco Phone #: ###-####...need listed gas flex connectors at equipment...terminations on furnace not per manuf
|
Final | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | NR |
Dixie Fellows
|
|
|
marco...need the air balance report
|
Final | 5/14/2012 | 5/15/2012 | 5/15/2012 | A | PEND |
Dixie Fellows
|
|
|
Marco Phone #: ###-####...will final when KDM schedules their final
|
Rough-in | 3/13/2012 | 3/14/2012 | 3/14/2012 | A | PART |
Dixie Fellows
|
|
|
marco Phone #: ###-####...ok for cover in all areas except wall behind type 1 hood, ceiling above hood and the beam to the right of the hood..they will require an inspection once rock and studs are installed
|
Conference | 3/9/2012 | 3/9/2012 | 3/13/2012 | A | PEND |
Dixie Fellows
|
|
|
MET WITH OWNER BUT THE INSTALLER ISN'T LICENSED TO DO WORK..THEY WILL RESCHEDULE
|
Conference | 3/5/2012 | 3/5/2012 | 3/13/2012 | A | PEND |
Dixie Fellows
|
|
|
|
Rough-in | 2/22/2012 | 2/23/2012 | 2/23/2012 | P | PART |
Dixie Fellows
|
|
|
Marco Phone #: ###-####...this permit is for the furnaces and ductwork only....doesn't include the kitchen equipment....ok for cover 2nd floor and main floor supply and return.. as well as the furnaces.. .gas was holding but are waiting for more info on kitchen equipment..
|