Final | 4/5/2012 | 4/6/2012 | 4/6/2012 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Final | 4/4/2012 | 4/5/2012 | 4/5/2012 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino Inspection cancelled from web by: Debbie Marino
|
Rough-in | 1/31/2012 | 2/1/2012 | 2/1/2012 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Rough-in | 1/27/2012 | 1/30/2012 | 1/30/2012 | P | PART |
Dixie Fellows
|
|
|
Matt with Momentum will perform the duct blast test at 2pm on 1/30/12 Phone #: ###-#### >> Inspection requested via web by Debbie Marino...f/p failed..no wood lower than stand-off on top.....duct blaster ok...gas ok
|
Pressure Test | 1/27/2012 | 1/30/2012 | 1/30/2012 | P | PASS |
Dixie Fellows
|
|
|
Matt with Momentum will perform the duct blast test at 2pm on 1/30/12 Phone #: ###-#### >> Inspection requested via web by Debbie Marino...20lb gas ok
|