Final | 3/19/2012 | 3/20/2012 | 3/20/2012 | A | PASS |
Eric Strole
|
|
|
|
Final | 3/19/2012 | 3/19/2012 | 3/19/2012 | P | NR |
Eric Strole
|
|
|
working on air balance report
|
Conference | 3/19/2012 | 3/19/2012 | 3/19/2012 | P | CANC |
Eric Strole
|
|
|
|
Final | 3/16/2012 | 3/19/2012 | 3/19/2012 | A | PEND |
Eric Strole
|
|
|
need to rebalance .
|
Final | 3/14/2012 | 3/16/2012 | 3/16/2012 | P | PEND |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison-need approval on air balance report.
|
Rough-in | 1/27/2012 | 1/30/2012 | 1/30/2012 | A | PASS |
Troy James
|
|
|
Blast test is scheduled for 9am on Monday 1/30/2012 so inspector needs to be there to witness that and re-inspect mechanical rough-in. Phone #: ###-#### >> Inspection requested via web by Brad Allison
|
Rough-in | 1/26/2012 | 1/27/2012 | 1/27/2012 | P | FAIL |
Troy James
|
|
|
Blast-test to be conducted at 1pm on Friday 1/27/12, Inspector needs to be there at 1pm to witness. If any questions, call Brad at ###-####. Phone #: ###-#### >> Inspection requested via web by Brad Allison c/n posted back window, pressure test ok did not tag gas line yet
|
Rough-in | 1/24/2012 | 1/26/2012 | 1/26/2012 | P | CANC |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison Inspection cancelled from web by: Brad Allison
|