Final | 2/28/2012 | 2/29/2012 | 2/29/2012 | A | PASS |
Dixie Fellows
|
|
|
Kitchen remodel final. CALL PERRY 30 MINS AHEAD TO MEET FOR ACCESS, ###-#### Phone #: ###-#### >> Inspection requested via web by Chris Field..clearances around range per manufacturer
|
Pressure Test | 1/31/2012 | 2/1/2012 | 2/1/2012 | A | PASS |
Dixie Fellows
|
|
|
**CONTACT PERRY, ###-#### TO ARRANGE ACCESS** Moved range gas line to new range location. Phone #: ###-#### >> Inspection requested via web by Chris Field...20lb fas ok...need to call for a final when cook-top installed
|