Final | 2/6/2012 | 2/7/2012 | 2/7/2012 | P | DONE |
Dixie Fellows
|
|
|
Scheduled final for 2/7/2012 PM. Please call George Durller before going out at ###-####. Phone #: ###-#### >> Inspection requested via web by Ernestina Garcia...this was already scheduled for this am
|
Final | 2/6/2012 | 2/7/2012 | 2/7/2012 | A | PASS |
Dixie Fellows
|
|
|
Scheduled final for 2-7-2012 AM. Please call George Durller before going out at ###-####. Phone #: ###-#### >> Inspection requested via web by Ernestina Garcia
|
Pressure Test | 2/3/2012 | 2/3/2012 | 2/3/2012 | P | CANC |
Dixie Fellows
|
|
|
Scheduled gas pressure test for 2/3/2012 PM. Please call George Durller before going out at ###-#### Phone #: ###-#### >> Inspection requested via web by Ernestina Garcia...did this in the am
|
Pressure Test | 2/2/2012 | 2/3/2012 | 2/3/2012 | A | PART |
Dixie Fellows
|
|
|
early as possible//George Durller Phone #: ###-####...20lb gas ok....need to seal all metal duct seams...need 1/4" slope per floot on flue back to furnace
|