Final | 8/16/2012 | 8/16/2012 | 8/17/2012 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Shaun Vogler-need approved-stamped manual-j on site for final. equipment was not installed on rough-in.
|
Final | 8/16/2012 | 8/17/2012 | 8/17/2012 | A | PASS |
Troy James
|
|
|
|
Mec-Aging Inspection | 6/28/2012 | 6/28/2012 | 6/28/2012 | | PEND |
Troy James
|
|
|
wip
|
Rough-in | 2/21/2012 | 2/21/2012 | 2/21/2012 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Shaun Vogler 25# test, no duct blast test
|
Rough-in | 2/14/2012 | 2/14/2012 | 2/14/2012 | P | FAIL |
Bill VanDegrift
|
|
|
1)provide secondary drain for upstairs furnace.(will install wet switch) 2) complete dryer exhaust rough-in. 3) resubmit manual J for bonus room. 4) rough in water heater flue( will be PVC through wall) 5)complete crawl space rough -in.
|
Rough-in | 2/13/2012 | 2/13/2012 | 2/14/2012 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Shaun Vogler-need to complete rough-in per manual j. Includes crawl.
|