Final | 4/30/2012 | 5/1/2012 | 5/1/2012 | A | PASS |
Troy James
|
|
|
>> Inspection requested via web by Dustin Rich
|
Rough-in | 3/1/2012 | 3/2/2012 | 3/2/2012 | A | PART |
Troy James
|
|
|
>> Inspection requested via web by Dustin Rich ok to cover floor for future second level, no inspection on relocated gas line yet
|
Pressure Test | 2/9/2012 | 2/10/2012 | 2/9/2012 | A | CANC |
Troy James
|
|
|
>> Inspection requested via web by Dustin Rich Inspection cancelled from web by: Dustin Rich
|