Final | 4/20/2012 | 4/23/2012 | 4/23/2012 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Rough-in | 2/22/2012 | 2/22/2012 | 2/22/2012 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Rough-in | 2/21/2012 | 2/21/2012 | 2/21/2012 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino-per manual j fresh air required to be 6".
|
Rough-in | 2/21/2012 | 2/22/2012 | 2/21/2012 | A | CANC |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino Inspection cancelled from web by: Debbie Marino
|
Rough-in | 2/20/2012 | 2/21/2012 | 2/21/2012 | A | FAIL |
Eric Strole
|
|
|
Building Energy will perform the duct blast test on 2/21/12 at 9:30am. Phone #: ###-#### >> Inspection requested via web by Debbie Marino-need approved manual j on site for rough-in-duct blast test pass
|
Rough-in | 2/17/2012 | 2/17/2012 | 2/17/2012 | P | FAIL |
Eric Strole
|
|
|
Ingo with Building Energy will perform the duct blast test at 3:30pm today Phone #: ###-#### >> Inspection requested via web by Debbie Marino-need manual j on site for rough-in and no show on duct blast test
|
Pressure Test | 2/17/2012 | 2/17/2012 | 2/17/2012 | P | PASS |
Eric Strole
|
|
|
Ingo with Building Energy will perform the duct blast test at 3:30pm today Phone #: ###-#### >> Inspection requested via web by Debbie Marino-20 lb test pass.
|