Final | 4/19/2012 | 4/19/2012 | 4/19/2012 | P | PASS |
Eric Strole
|
|
|
please call for instructions if locked... Phone #: ###-#### >> Inspection requested via web by David Petsche
|
Final | 4/18/2012 | 4/19/2012 | 4/19/2012 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by David Petsche-no access, left notice.
|
Rough-in | 2/17/2012 | 2/17/2012 | 2/17/2012 | A | PASS |
Eric Strole
|
|
|
rough-in and duct blast pass, need to check makeup air on final.
|
Conference | 2/16/2012 | 2/17/2012 | 2/17/2012 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by David Petsche
|
Pressure Test | 2/16/2012 | 2/16/2012 | 2/16/2012 | P | PASS |
Eric Strole
|
|
|
pressure test inspected by intermountain gas
|