Final | 6/19/2012 | 6/20/2012 | 6/20/2012 | A | PASS |
Alan Hauser
|
|
|
|
Final | 6/18/2012 | 6/18/2012 | 6/18/2012 | P | FAIL |
Alan Hauser
|
|
|
couldn't find air balance reports for each unit, all else ok
|
Conference | 5/30/2012 | 5/31/2012 | 5/31/2012 | A | PASS |
Alan Hauser
|
|
|
Duct Blasts are being done on all 6 units by Matt @ Momentum. Thursday the 31st. Just scheduled conference in case you needed to witness. duct blaster test re passing
|
Conference | 4/17/2012 | 4/18/2012 | 4/17/2012 | A | PEND |
Dixie Fellows
|
|
|
called conrad and told him duct blaster needs to be done at r/i
|
Pressure Test | 3/16/2012 | 3/16/2012 | 3/16/2012 | P | PASS |
Alan Hauser
|
|
|
all 6 test passed
|
Rough-in | 3/16/2012 | 3/16/2012 | 3/16/2012 | P | PART |
Alan Hauser
|
|
|
all above floor ok, recall when crawlspaces are done for final r/i
|
Conference | 2/22/2012 | 2/23/2012 | 2/22/2012 | A | PASS |
Troy James
|
|
|
>> Inspection requested via web by Konrad Swartz
|