Final | 4/20/2012 | 4/23/2012 | 4/23/2012 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Rough-in | 2/27/2012 | 2/28/2012 | 2/28/2012 | A | PASS |
Troy James
|
|
|
Building Energy will perform the duct blast test on 2/28/12 at 10am Phone #: ###-#### >> Inspection requested via web by Debbie Marino duct blast ok check pvc flue is glued at elbow
|
Pressure Test | 2/27/2012 | 2/28/2012 | 2/28/2012 | A | PASS |
Troy James
|
|
|
Building Energy will perform the duct blast test on 2/28/12 at 10am Phone #: ###-#### >> Inspection requested via web by Debbie Marino 25#
|