Final | 5/9/2012 | 5/9/2012 | 5/9/2012 | P | PASS |
Bill VanDegrift
|
|
|
Please complete a Final re-inspection. If there are any questions/concerns, please contact Eric @ ###-#### (HR 4/17) Phone #: ###-#### >> Inspection requested via web by Jennifer Bryan final ok
|
Final | 5/7/2012 | 5/8/2012 | 5/8/2012 | A | FAIL |
Troy James
|
|
|
Please complete a final inspection. If there are any questions/issues, please contact Eric @ ###-#### (HR 4/17) Phone #: ###-#### >> Inspection requested via web by Jennifer Bryan unable to access home due to the floor covering, please reschedule
|
Pressure Test | 3/1/2012 | 3/2/2012 | 3/2/2012 | A | PASS |
Eric Strole
|
|
|
Please complete a Pressure Test inspection to and include a duct blasting test. The duct blasting request was also included on the Rough-In inspection request. If there are any questions/concerns, please contact Eric @ ###-#### (HR 4/17) Phone #: ###-#### >> Inspection requested via web by Jennifer Bryan-20 lb test pass
|
Rough-in | 3/1/2012 | 3/2/2012 | 3/2/2012 | A | PASS |
Eric Strole
|
|
|
Please complete a Rough-In inspection and include duct blasting. If there are any questions/concerns, please contact Eric @ ###-#### (HR 4/17) Phone #: ###-#### >> Inspection requested via web by Jennifer Bryan-duct blast and rough-in pass.
|