Final | 5/30/2012 | 5/31/2012 | 5/31/2012 | P | PASS |
Dixie Fellows
|
|
|
Nathan is general on site Phone #: ###-#### >> Inspection requested via web by Brian Preece
|
Rough-in | 3/15/2012 | 3/16/2012 | 3/16/2012 | A | PASS |
Eric Strole
|
|
|
gas sleeve has been adjusted, CSST tied down. 100% Phone #: ###-#### >> Inspection requested via web by Brian Preece
|
Rough-in | 3/13/2012 | 3/13/2012 | 3/13/2012 | P | FAIL |
Dixie Fellows
|
|
|
Secondary rough in. All as per manufacturer specs with adapter. Phone #: ###-#### >> Inspection requested via web by Brian Preece...NEED TO SLEEVE GAS THROUGH F/P JACKET...REINSPECTION FEE
|
Conference | 3/7/2012 | 3/7/2012 | 3/7/2012 | P | PASS |
Dixie Fellows
|
|
|
Ryan...will fix c/n and recall
|
Conference | 3/7/2012 | 3/7/2012 | 3/7/2012 | A | FAIL |
Dixie Fellows
|
|
|
Ryan...not installed per manuf
|