Final | 5/3/2012 | 5/3/2012 | 5/3/2012 | A | PASS |
Bill VanDegrift
|
|
|
|
Final | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | NH |
Bill VanDegrift
|
|
|
Call Adam for access: ###-#### Phone #: ###-#### >> Inspection requested via web by Frank Marturello called no answer left message went by left notice
|
Rough-in | 3/19/2012 | 3/20/2012 | 3/20/2012 | A | PASS |
Eric Strole
|
|
|
9:00 am-duct blast, 20 lb gas test and rough-in pass.
|
Rough-in | 3/16/2012 | 3/19/2012 | 3/19/2012 | A | NR |
Eric Strole
|
|
|
r/i and duct blast test //Ingo ###-####
|
Rough-in | 3/15/2012 | 3/16/2012 | 3/16/2012 | P | DONE |
Eric Strole
|
|
|
cancelled 11:45 (leg called 380), rescheduled for Monday
|
Rough-in | 3/13/2012 | 3/15/2012 | 3/15/2012 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Frank Marturello-20 lb gas test pass, per building inspector duct work in attic space needs to be raised up for r-41 insulation. just need to check straping and possible duck blast test.
|