Final | 5/4/2012 | 5/4/2012 | 5/4/2012 | P | PASS |
Eric Strole
|
|
|
Call Brian ###-#### with any corrections/questions please. Thanks, Andrea. Phone #: ###-#### >> Inspection requested via web by Andrea Creek
|
Rough-in | 3/22/2012 | 3/23/2012 | 3/23/2012 | A | PASS |
Eric Strole
|
|
|
Jeff Phone #: ###-####
|
Rough-in | 3/19/2012 | 3/20/2012 | 3/20/2012 | A | FAIL |
Eric Strole
|
|
|
DUCT BLASTER TEST 9AM PLEASE WITH MATT ###-####. Please call Brian if any corrections ###-####. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-wrong furnace per manual j, need heat sheild on b-vent , need 1" clearance at b-vent thru roof and need exhaust vents hooked up.
|
Pressure Test | 3/19/2012 | 3/20/2012 | 3/20/2012 | A | PASS |
Eric Strole
|
|
|
DUCT BLASTER TEST 9AM PLEASE WITH MATT ###-####. Please call Brian if any corrections ###-####. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-20 lb test pass
|