Final | 7/6/2012 | 7/6/2012 | 7/6/2012 | P | PASS |
Dixie Fellows
|
|
|
april ###-####
|
Final | 6/29/2012 | 7/6/2012 | 7/6/2012 | A | PEND |
Dixie Fellows
|
|
|
Call Jon for access, ###-####. Phone #: ###-#### >> Inspection requested via web by April Thomas....rescheduled for pm
|
Conference | 6/29/2012 | 7/6/2012 | 6/29/2012 | A | CANC |
Dixie Fellows
|
|
|
Call Jon for access, ###-####. Phone #: ###-#### >> Inspection requested via web by April Thomas Inspection cancelled from web by: April Thomas
|
Final | 6/19/2012 | 6/20/2012 | 6/20/2012 | A | NR |
Dixie Fellows
|
|
|
Call Jon with any acccess issues, ###-####. Thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas (This activity was added in error so we have changed the case status back to Issued.)
|
Pressure Test | 5/10/2012 | 5/11/2012 | 5/11/2012 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas...60lb gas to pool htr ok
|
Pressure Test | 4/9/2012 | 4/10/2012 | 4/10/2012 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas....20lb gas to furnace ok
|
Rough-in | 4/9/2012 | 4/10/2012 | 4/10/2012 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas
|
Pressure Test | 4/3/2012 | 4/4/2012 | 4/4/2012 | A | PART |
Dixie Fellows
|
|
|
one high pressure test & one low pressure test Phone #: ###-#### >> Inspection requested via web by April Thomas...60lb gas to pool ok...test at furnace has a leak
|
Pressure Test | 3/23/2012 | 3/23/2012 | 3/23/2012 | P | PASS |
Dixie Fellows
|
|
|
As late as possible in the afternoon. Please call me before going out to make sure it is ready. Thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas...20 u/g to hot tub ok
|